Designing Your Control Room
UCDS has in-depth experience in designing control rooms and modifying existing field shelters. Our process is compliant with the ISO 11064 Ergonomic Design Standard for Control Buildings. We interview management, supervision and a significant group of the operators to understand functional requirements, what works well in the existing environment, and identification and correction of problems with the existing design.
Some customers prefer to walk away from their existing building and move the field operators into a Modular Blast Resistant Building. Our process helps facilitate this move and provides a detailed design for the Modular Building manufacturer.
We help identify if you can rationalize many field shelters into a smaller number of more centralized field shelters. One site went from 16 field shelters to 3 new field shelters, utilizing modular buildings, located in strategic locations.
We can help you through the entire process. If you are needing control room services please contact us to take the next step.